My driveway is dirt and gravel with some larger rocks mixed in. It’s tough to clear with bare, thawed ground. I have longer skids on it now so that should help, but I’m raising it anyway. I think 1-1.25” will be a good height. Tuesday should be able to melt that much remaining on the driveway.